New since last week: (04.06.2020)
-Toothed boards (in wall purlins)
-Notches in wall purlins to fit toothed boards
-Pegs to join upper & lower hip rafters
-Notches for rafters in upper & outer longitudinal ties
-Lower rafters (wip)
Above: lower rafters (wip).
Things that need to be done before I start the upper rafters:
-Outer & inner lower rafter supportsĀ 
-Hold down beam
-Upper rafter support
-Lower rafter backing boards
-Duplicating the above setup for the front/back lower rafters
New since Tuesday: (04.08.2020)
-Finished lower rafters
-Outer & inner lower rafter supports (wip)
-Hold down beam

Remaining before I start the upper rafters:
-Attaching lower rafter supports to hip rafters (right now they're suspended in mid-air)
-Upper rafter support
-Lower rafter backing boards